*Additional Details:
3/25/2026 10:58:58 AM
PANEL SWAP INCLUDED IN SOW 100 AMP PANEL TO 200 AMP
6/17/2026 9:51:38 AM
RCVD A REVISION TO ADD ENGINEERING TO THE SOW
9/1/2026 9:34:28 AM
Posted stop work order on 8/31/26 contractor working outside scope of work