*Additional Details:
1/19/2024 10:29:21 AM
CONTRACTOR TBD
1/19/2024 10:30:45 AM
SCOPE OF WORK: NEW LEASE AREA WITH NEW GROUND MOUNTED EQUIPMENT CABINETS INSIDE EXISTING ATC MULTI-CARRIER COMPOUND / LEASE AREA AND NEW UTILITIES TO NEW SITE LOCATION. NEW EXTENSION ON EXISTING ATC STEEL MONOPOLE WITH NEW ANTENNAS AND ANTENNA EQUIPMENT.
1/19/2024 10:31:15 AM
PLANS ALSO SHOW ADDITIONAL SCOPE TO INCLUDE NEW FENCING AND 30kW GENERATOR.
1/19/2024 10:41:34 AM
REVIEW CHECKLIST REVIEWED WITH AND PROVIDED TO APPLICANT.
1/19/2024 10:42:43 AM
INTAKE ONLY INCLUDED 1 COPY OF TOWER STRUCTURAL ANALYSIS REPORT
1/19/2024 10:50:14 AM
PLANS OKAY FOR INTAKE PER BLCGS
3/4/2024 1:24:16 PM
ORIGINAL TOWER/EQUIPMENT SHELTER #47581 (94088102) F: 10/05/1994
NEW 52’ STEEL MONOPOLE AT EXISTING WIRELESS FACILITY (TO REPLACE (E)) #349412 F: 11/07/2023
3/19/2024 1:33:44 PM
RECVD REQUEST TO UPDATE CONTACT EMAIL FOR APPLICANT. FROM SRANGEL@COMPLETEWIRELESS.NET TO BP@COMPLETEWIRELESS.NET.
4/24/2024 9:41:34 AM
REVISED APPLICATION RCVD, STILL CONTRACTOR TBD. APPLICANT CHANGED TO RANDY MIKUNI. (WAS SALVADOR RANGEL)
6/7/2024 9:44:07 AM
REVISION: PGE SUBMITTED A LATE REVISION TO THE UTILITY DESIGN IMPACTING POWER AND FIBER PULL BOX. ADDITIONAL MINOR REVISIONS FOR CABLING AND CHAIN LINK FENCE.