*Additional Details:
12/22/2022 8:15:43 AM
NO SOLAR SUBMITTED - SOLAR EXEMPTION LETTER PROVIDED.
4/28/2025 4:02:01 PM
QUOTED 1ST RENEWAL W/ 15% CREDIT
$445,411.94 – 15% thru slab = $378,600.14 x 0.005 = $1,893.00
5/15/2025 2:40:43 PM
QUOTED 1ST RENEWAL W/ 75% CREDIT
$445,411.94 x .005 x 25% remaining work = 556.76
QUOTED 1ST RENEWAL W/ 80% CREDIT
$445,411.94 x .005 x 20% remaining work = 445.41
Owner set up sheetrock inspection prior to expiration on 05/28/2025. advised him statement of non-use will be required and to come in after inspection.
6/2/2025 1:28:35 PM
Passed sheetrock inspection. 80% credit to renew. 20% of cost is $89082.39 x .005
total due = $445.41. RCVD NON-USE FORM, ATTACHED.
5/13/2026 4:47:09 PM
OWNER'S IN TO SCHEDULE BUILDING/PERMIT FINAL INSPECTIONS FOR 6/10/2026, WITHIN THE 30 GRACE PERIOD. OWNER WILL CONTACT EDC FIRE FOR FIRE DEPT FINAL INSPECTION.
OWNERS' ADVISED THAT IF PERMIT DOES NOT PASS PERMIT FINAL INSPECTION TO COME IN NO LATER THAN 6/12/2026 TO RENEW PERMIT, OTHERWISE REACTIVATION OF THE EXPIRED PERMIT WILL BE REQUIRED AFTER 6/12/2026.