*Additional Details:
2/3/2026 3:41:18 PM
SFD 23514 FINALED 10/20/1978 (DIGITAL REEL ATTACHED TO APN).
2/3/2026 3:42:17 PM
SCOPE OF WORK: 1ST FLOOR ADDITION AND ADDING A SECOND FLOOR. ADDITION INCLUDES 2 BEDROOMS, A BATHROOM, LOFT, AND NEW ENTRY ON THE FIRST FLOOR.